CHOWDENE CHAPEL


Chowdene is a Primitive Methodist chapel constructed in 1880 and used for Christian worship up to the present day. With a distinctive gable end facing perpendicular to the adjacent terraces and onto Durham Road in Low Fell, the chapel is an identifiable landmark at the southern gateway into Gateshead and Newcastle.
Working from early feasibility through to construction on site, Northern Bureau for Architecture were appointed to explore options for bringing the chapel up to date for congregational worship, but also to open it up to the local community for gatherings, celebrations and recreation.
Central to the project was the issue of accessibility, with the main hall elevated 1.5 meters above the street level and the lower hall reached only by a steep side alley, the existing building posed significant challenges to a range of individuals, from those with mobility restrictions to parents with buggies and many others. Furthermore, beyond use by the congregation, these access issues created barriers to community outreach projects.
Though not listed, its prominent location within the Low Fell Conservation Area meant the chapel is included on Gateshead’s Local List of buildings with special historic or architectural interest. Accordingly, proposals were driven by a need for sensitivity to the historic fabric and features, whilst acknowledging a hierarchy of value for specific elements of the building with its accretions of differential quality.
The resulting strategy of designating service and served spaces emerged from the historic distinction of the original 1880s building – defined by the gable end form with its two main halls – and the adjacent flat roofed extension of 1901. This later extension was reconfigured internally to accommodate a new lift with an opening at the street level as well as accessible toilets, a kitchen, and a new servery; centrally positioned to create a café space within the lower hall.

CLIENT:
Strongpoint CIO
STATUS:
Completed
DURATION:
2021 – 2024




The need for a sheltered vestibule to the new lift opening led to the introduction of the only new build element of construction, an articulated Douglas fir frame that makes reference to historic lychgates; typically timber structures that mark the division between consecrated and un-consecrated ground at the point of entry to a churchyard.
The timber frame draws its setting out strictly from the existing constraints of site boundary, building line, historic parapet, arched window head, door transom and memorial plaque all harmonised in a simple rectilinear form which, though contemporary, matches the proportion and rhythm of the historic building.
To maximise the visibility of the historic elevation behind, the lobby is clad in transparent polycarbonate, on an evening light spills out, and with its elevated height the lobby transforms into a gently glowing beacon, welcoming visitors.
Up close, in its detailing, the timber lobby offers modest civic gestures that act as moments of contact with the wider public on this busy street frontage. A deep cill to the boundary wall offers a place to lean while waiting for the bus at the adjacent stop, the concrete flags of the pavement extend into the lobby offering an uninterrupted extension of the public realm, and the door pushes out in welcome to create an articulated threshold to this new point of entry.
Internally we oversaw a process of carefully stripping back layers of poorly considered interventions and successive alterations, before re-introducing new elements to mark changing uses. The result is not a levelling or negation of the building’s layered history to create a tabula rasa, but rather a balanced collage of new and old with each element given an identifiable yet complimentary presence. In particular, new MDF panelling to the lower hall evokes historic joinery with cost effective materials, eliding notions of ‘high’ and ‘low’ architectures.
As well as securing Planning and Building Control approvals, Northern Bureau for Architecture played a key role in maximising constrained budgets by overseeing and co-ordinating discreet elements of phased intervention with a series of different contractors.







Internally we oversaw a process of carefully stripping back layers of poorly considered interventions and successive alterations, before re-introducing new elements to mark changing uses. The result is not a levelling or negation of the building’s layered history to create a tabula rasa, but rather a balanced collage of new and old with each element given an identifiable yet complimentary presence. In particular, new MDF panelling to the lower hall evokes historic joinery with cost effective materials, eliding notions of ‘high’ and ‘low’ architectures.
As well as securing Planning and Building Control approvals, Northern Bureau for Architecture played a key role in maximising constrained budgets by overseeing and co-ordinating discreet elements of phased intervention with a series of different contractors.